Construction Documentation
On-site inspection of column footing reinforcement and steel cage assembly.
Continued on-site inspection of column footing reinforcement and steel cage assembly.
General site progress and ongoing construction activities.
Initial stages of slab roofing reinforcement and preparation for concrete pouring.
Documentation of the ongoing slab roofing construction and structural details.
Final stages and reinforcement check before the major concrete pour.
Detailed application of skim coating to achieve a smooth wall finish.
Professional painting process showcasing the initial color transformation.
Final coating and finishing touches on the exterior/interior walls.
Continued documentation of the slab roofing construction and structural details.
Further updates on the slab roofing process and preparations.
Design walkthrough and interior presentation of the Massage Spa and Nail Salon project.
Documentation of exhaust fan installation and ventilation works.